Climb Newcastle News: A room with two sides

With all the recent pictures of the roof and steep boards at pool level you could be forgiven if you thought "that is all" we had. Don't be fooled, the lower level is barely a third of this room and here is a first glimpse of the outsides of the pool in construction. The angles out here will include some easier angled sections, slabs and vertical walls as well as (pictured) more steep boards including a double step, a barrel and what we like to call the "chin scraper"; a 20 degree overhang kicking back into a 5 degree slab...bring on the setting!

A room with two sides